


{"id":11315,"date":"2025-06-18T01:50:12","date_gmt":"2025-06-18T01:50:12","guid":{"rendered":"https:\/\/ecolakes.vn\/chinh-thuc-khoi-cong-duong-vanh-dai-4-tp-hcm-doan-qua-binh-duong\/"},"modified":"2025-06-25T02:01:48","modified_gmt":"2025-06-25T02:01:48","slug":"chinh-thuc-khoi-cong-duong-vanh-dai-4-tp-hcm-doan-qua-binh-duong","status":"publish","type":"post","link":"https:\/\/ecolakes.vn\/en\/chinh-thuc-khoi-cong-duong-vanh-dai-4-tp-hcm-doan-qua-binh-duong\/","title":{"rendered":"Official Groundbreaking of Ring Road 4 \u2013 Ho Chi Minh City Section in Binh Duong"},"content":{"rendered":"<h2 class=\"detail-sapo\" data-role=\"sapo\"><span style=\"font-size: 14pt;\">(NL\u0110O) &#8211; The Binh Duong section of Ring Road 4 \u2013 HCMC (Phase 1) includes 4 main lanes, full-length emergency lanes, and a design speed of 100 km\/h.<\/span><\/h2>\n<div class=\"detail-cmain\">\n<p data-start=\"86\" data-end=\"418\"><span style=\"font-size: 14pt;\">On the afternoon of June 18, Deputy Prime Minister Mai Van Chinh attended the groundbreaking ceremony of the Phase 1 construction project of Ring Road 4 \u2013 Ho Chi Minh City, for the section from Thu Bien Bridge to the Saigon River, which runs through Tan Uyen City, Ben Cat Town, and Bac Tan Uyen District in Binh Duong Province.<\/span><\/p>\n<p data-start=\"420\" data-end=\"556\"><span style=\"font-size: 14pt;\">The project is implemented under the Build \u2013 Operate \u2013 Transfer (BOT) model, with a total investment capital of VND 11.743 trillion.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-11304\" src=\"https:\/\/ecolakes.vn\/wp-content\/uploads\/2025\/06\/mai-van-chinh-17502323625961076389726.webp\" alt=\"\" width=\"698\" height=\"354\" srcset=\"https:\/\/ecolakes.vn\/wp-content\/uploads\/2025\/06\/mai-van-chinh-17502323625961076389726.webp 698w, https:\/\/ecolakes.vn\/wp-content\/uploads\/2025\/06\/mai-van-chinh-17502323625961076389726-300x152.webp 300w\" sizes=\"(max-width: 698px) 100vw, 698px\" \/><\/span><\/p>\n<p style=\"text-align: center;\"><em>Deputy Prime Minister Mai Van Chinh inspects the design layout and route alignment of Ring Road 4.<\/em><\/p>\n<p style=\"text-align: justify;\" data-start=\"85\" data-end=\"292\"><span style=\"font-size: 14pt;\">The project&#8217;s capital is mobilized from equity, bank loans, and other legal sources. The preparation and construction period is expected to last 26 months from the effective date of the project contract.<\/span><\/p>\n<p style=\"text-align: justify;\" data-start=\"294\" data-end=\"666\"><span style=\"font-size: 14pt;\">Phase 1 of the project features 4 traffic lanes with continuous emergency stopping lanes and a design speed of 100 km\/h. The project aims to facilitate regional connectivity and enhance the efficiency of expressways and national highways, especially in linking Long Thanh International Airport with surrounding provinces and cities in the Southern Key Economic Region.<\/span><\/p>\n<p style=\"text-align: justify;\" data-start=\"668\" data-end=\"1054\"><span style=\"font-size: 14pt;\">Mr. Nguyen Van Hung, Chairman of the Board of Directors of Becamex IDC Corporation (the project contractor), emphasized that Ring Road 4 plays a vital strategic role as an East\u2013West backbone, connecting the province\u2019s major growth hubs and the broader region. It will enable faster access to seaports and international airports such as Cai Mep \u2013 Thi Vai Port and Long Thanh Airport.<\/span><\/p>\n<\/div>\n<p><span style=\"font-size: 14pt;\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-11307\" src=\"https:\/\/ecolakes.vn\/wp-content\/uploads\/2025\/06\/vanh-dai4-1750232432142122198561.jpg\" alt=\"\" width=\"698\" height=\"393\" srcset=\"https:\/\/ecolakes.vn\/wp-content\/uploads\/2025\/06\/vanh-dai4-1750232432142122198561.jpg 698w, https:\/\/ecolakes.vn\/wp-content\/uploads\/2025\/06\/vanh-dai4-1750232432142122198561-300x169.jpg 300w\" sizes=\"(max-width: 698px) 100vw, 698px\" \/><\/span><\/p>\n<p style=\"text-align: center;\"><em>Perspective view of Ring Road 4 \u2013 Ho Chi Minh City (Binh Duong section)<\/em><\/p>\n<p style=\"text-align: justify;\" data-start=\"85\" data-end=\"453\"><span style=\"font-size: 14pt;\">For many years, Becamex has proactively integrated the Ring Road 4 alignment into our development projects and independently completed nearly 50% of the Ring Road 4 segment within Binh Duong Province using corporate capital. Today, our consortium officially breaks ground on the remaining section of the Ring Road 4 that runs through the province,&#8221; said Mr. Hung.<\/span><\/p>\n<p style=\"text-align: justify;\" data-start=\"455\" data-end=\"654\"><span style=\"font-size: 14pt;\">According to the official decision, the selected investor for the project is a consortium consisting of Becamex IDC Corp (BCM), Becamex Infrastructure Development JSC (IJC), and Deo Ca Group JSC.<\/span><\/p>\n<p style=\"text-align: justify;\" data-start=\"656\" data-end=\"937\"><span style=\"font-size: 14pt;\">In addition to launching the Ring Road 4 project, Binh Duong has also inaugurated major provincial roads DT743, DT746, and DT747B\u2014key internal transportation arteries that contribute to the development of a modern and synchronized traffic network in this industrial powerhouse.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(NL\u0110O) &#8211; The Binh Duong section of Ring Road 4 \u2013 HCMC (Phase 1) includes 4 main lanes, full-length emergency lanes, and a design speed of 100 km\/h. On the afternoon of June 18, Deputy Prime Minister Mai Van Chinh attended the groundbreaking ceremony of the Phase 1 construction project of Ring Road 4 \u2013 &#8230; <a title=\"Official Groundbreaking of Ring Road 4 \u2013 Ho Chi Minh City Section in Binh Duong\" class=\"read-more\" href=\"https:\/\/ecolakes.vn\/en\/chinh-thuc-khoi-cong-duong-vanh-dai-4-tp-hcm-doan-qua-binh-duong\/\" aria-label=\"More on Official Groundbreaking of Ring Road 4 \u2013 Ho Chi Minh City Section in Binh Duong\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":11312,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[2],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/posts\/11315"}],"collection":[{"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/comments?post=11315"}],"version-history":[{"count":3,"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/posts\/11315\/revisions"}],"predecessor-version":[{"id":11319,"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/posts\/11315\/revisions\/11319"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/media\/11312"}],"wp:attachment":[{"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/media?parent=11315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/categories?post=11315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ecolakes.vn\/en\/wp-json\/wp\/v2\/tags?post=11315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}