Tin dự án

Official: Binh Duong to Build Elevated Urban Railway Connecting to Ho Chi Minh City

01/06/2025

[CafeLand] The Urban Railway Line No. 2 from Thu Dau Mot City to Ho Chi Minh City is nearly 22 km long, with two options: elevated or underground. Based on the estimated investment capital, Binh Duong province has chosen to build the elevated urban railway to save more than 15,000 billion VND.

Recently, Mr. Vo Van Minh, Chairman of Binh Duong Provincial People’s Committee, chaired a meeting to hear the pre-feasibility study report for Urban Railway Line No. 2 from Thu Dau Mot City to Ho Chi Minh City.

This Urban Railway Line No. 2 starts by connecting to the S5 station of Line No. 1 located in Phu My Ward (Thu Dau Mot City); the endpoint is in Vinh Phu Ward (Thuan An City), connecting to the extended Line No. 3 of Ho Chi Minh City at Hiep Binh Phuoc Ward (Thu Duc City).

The total length of the line is nearly 22 km. It is expected to have about 13 stations, including 1 elevated station, 12 underground stations, and 1 depot (planned to share the depot with Line No. 1 in Phu Chanh Ward (Tan Uyen City, Binh Duong) or share with Line No. 3 of Ho Chi Minh City at Hiep Binh Phuoc Ward (Thu Duc City).

Binh Duong reviews the option for Urban Railway Line No. 2 from Thu Dau Mot City to Ho Chi Minh City

Urban Railway Line No. 2 in Binh Duong will pass through Thu Dau Mot City and Thuan An City; it is designed to handle a capacity of 30,000 to 40,000 passengers per direction per hour, connecting Thu Dau Mot City to Ho Chi Minh City and other urban areas along the railway line.

Regarding the investment capital, the related agencies have proposed two options:

  • Option 1: Elevated construction, with an estimated capital of over 53,000 billion VND.

  • Option 2: Underground construction, with an estimated capital of over 68,500 billion VND.

Route direction of Metro Line 2 from Thu Dau Mot City to Ho Chi Minh City

After review, Mr. Vo Van Minh, Chairman of Binh Duong Provincial People’s Committee, gave specific comments on the route direction, longitudinal profile options, and station locations through Thu Dau Mot City and Thuan An City.

Regarding the investment capital, the Chairman agreed with Option 1, which is the elevated route.

The provincial leadership believes this is the optimal option, helping save a significant amount of capital (more than 15,000 billion VND).

Accordingly, the Binh Duong Provincial People’s Committee assigned departments to coordinate with localities and consulting units to urgently provide data and complete the report content for the Standing Committee of the Provincial People’s Committee to seek opinions from the Provincial Party Committee Standing Board.

It is known that Urban Railway Line No. 2 from Thu Dau Mot City (Binh Duong) to Ho Chi Minh City plays a role in connecting the centers of Thu Dau Mot and Ho Chi Minh City along National Highway 13. This railway line is expected to contribute to reducing traffic congestion, especially when Binh Duong merges with Ho Chi Minh City, enhancing smooth connectivity and promoting socio-economic development of the new Ho Chi Minh City after the merger.

Tin tức khác

TIN LIÊN QUAN

08/10/25

LỜI CẢM ƠN GỬI ĐẾN CÁC ĐỐI TÁC VÀ ĐƠN VỊ ĐỒNG HÀNH CÙNG COLOR RUN ECOLAKES 2025

Sự thành công rực rỡ của Color Run EcoLakes 2025 – diễn ra ngày 5/10 vừa qua – không chỉ đến từ tinh thần “No Fear – Just Fun” của hơn 2.000 vận động viên, mà còn nhờ vào sự đồng hành quý báu của các đơn vị, tổ chức và đối tác trong suốt ... Read more
05/10/25

2.000 người chinh phục đường chạy Color Run EcoLakes 2025

[VnExpress] Hơn 2.000 người tham gia sự kiện Color Run EcoLakes 2025 với đường chạy sắc màu kết hợp hoạt động Halloween tại đại đô thị EcoLakes Mỹ Phước, sáng 5/10. Xuất phát từ 6h30, hàng nghìn người hòa vào đường chạy sôi động với cự ly 5km tại khu vực phố ẩm thực – ... Read more
17/09/25

SetiaBecamex khởi công Valley of Dreams II – Luxury tại EcoLakes Mỹ Phước

[CafeF] Ngày 17/09/2025, SetiaBecamex chính thức khởi công dự án biệt thự cao cấp Valley of Dreams II – Luxury tại EcoLakes Mỹ Phước, mở ra chuẩn mực sống thượng lưu với không gian Home-retreat sang trọng, công viên chủ đề gần 5ha và hệ sinh thái xanh bền vững.   Kiến trúc Home-retreat chuẩn ... Read more
22/08/25

SetiaBecamex Breaks Ground on The GLAMOUR: A New Standard of Luxury Living in the Heart of the Eco-Urban Township

The GLAMOUR – the newest premium subzone at EcoLakes Mỹ Phước – has officially broken ground. With its elegant Neoclassical design, modern amenities, and strategic location, the project is set to become a new symbol of both residence and investment at the northern gateway of Ho Chi Minh City. On August 21, 2025, from 09:30 ... Read more
02/08/25

Bất động sản vệ tinh: Bước chuyển mình thành trung tâm phát triển đột phá

[CafeF] Mỹ Phước đang chuyển mình từ “vùng xa” thành tâm điểm bất động sản vệ tinh phía Bắc TP.HCM, nhờ hạ tầng giao thông đột phá và quy hoạch chiến lược. Từ “vùng xa” đến trung tâm liên kết vùng chiến lược Từ vị thế là “vùng xa”, Mỹ Phước đang vươn lên trở ... Read more
18/06/25

Official Groundbreaking of Ring Road 4 – Ho Chi Minh City Section in Binh Duong

(NLĐO) – The Binh Duong section of Ring Road 4 – HCMC (Phase 1) includes 4 main lanes, full-length emergency lanes, and a design speed of 100 km/h. On the afternoon of June 18, Deputy Prime Minister Mai Van Chinh attended the groundbreaking ceremony of the Phase 1 construction project of Ring Road 4 – ... Read more
04/06/25

Striving to Complete Ho Chi Minh City’s Ring Road 4 by the End of 2028

(Chinhphu.vn) – Prime Minister Pham Minh Chinh has requested relevant agencies to mobilize resources and strive to complete the Ring Road 4 project in Ho Chi Minh City by the end of 2028. Target to Complete Ho Chi Minh City Ring Road 4 Project by End of 2028 The Government Office has issued Official Dispatch ... Read more
01/06/25

Official: Binh Duong to Build Elevated Urban Railway Connecting to Ho Chi Minh City

[CafeLand] The Urban Railway Line No. 2 from Thu Dau Mot City to Ho Chi Minh City is nearly 22 km long, with two options: elevated or underground. Based on the estimated investment capital, Binh Duong province has chosen to build the elevated urban railway to save more than 15,000 billion VND. Recently, Mr. Vo ... Read more
25/05/25

Real Estate in Focus: 10 Urgent Directives from the Prime Minister

At a working session between the Standing Government and ministries, sectors, associations, banks, and businesses, Prime Minister Phạm Minh Chính issued 10 urgent directives to address challenges in Vietnam’s real estate market. At the meeting, delegates assessed that real estate supply remains limited, with a mismatch in market segments. The implementation of social housing is ... Read more
16/05/25

Binh Duong Organizes 2025 Community Swimming Campaign for Child Drowning Prevention at EcoLakes My Phuoc

On the morning of May 16, 2025, at the EcoLakes My Phuoc Eco-township (Thoi Hoa Ward, Ben Cat City, Binh Duong Province), the Department of Culture, Sports and Tourism of Binh Duong Province, in coordination with the People’s Committee of Ben Cat City, organized the launching ceremony of the 2025 Public Swimming Exercise Campaign for ... Read more
error: Content is protected !!